Civil Elephant Road Bridge
Westlake Punnett & Associates Pty Ltd were engaged by Soil Conservation Service NSW to provide Civil and Structural Engineering design for a bridge along Elephant Road, Milton which required replacement.
Our involvement included the following:
- Meeting on site with Soil Conservation to establish scope and solutions.
- Hydrological catchment analysis.
- Structural design of bridge using steel girders and precast deck.
- Inspections during construction.
- Respond to RFI’s during construction.
- Certification of the as-constructed bridge.
- Organisation and design-side project management of consultants.